ZENTRALER OMNIUSBAHNHOF (ZOB) MÖNCHENGLADBACH

Mönchengladbach, Germany

Assembly of steel and sheet metal constructions, roof construction with ETFE covering.

Quantity: Assembly of 2 roofs with approx. 180 tonnes of steel structure

Welding work on assembly joints: Welding of approx. 107 beam joints

Installation of sheet metal (268 running metres), gratings (approx. 430 pieces) and drainage (11 pieces)

Coating work: Touch-up work on the construction site totalling 2,630m² of coating area

Coating of the welding areas: approx. 1,335m² final top coat on the construction site

Contract realization: 2024-2025

ZENTRALER OMNIUSBAHNHOF (ZOB) MÖNCHENGLADBACH