Mönchengladbach, Germany
Assembly of steel and sheet metal constructions, roof construction with ETFE covering.
Quantity: Assembly of 2 roofs with approx. 180 tonnes of steel structure
Welding work on assembly joints: Welding of approx. 107 beam joints
Installation of sheet metal (268 running metres), gratings (approx. 430 pieces) and drainage (11 pieces)
Coating work: Touch-up work on the construction site totalling 2,630m² of coating area
Coating of the welding areas: approx. 1,335m² final top coat on the construction site
Contract realization: 2024-2025